Tanker Truck Loading System
Loading & Unloading Systems · Tanker Loading & Unloading
Over 250 m³/h, nitrogen inerting, automatic docking.
Design data
- Loading capacity
- > 250 m³/h
- Loading pipe
- DN300
- Safety
- Nitrogen inerting with online O₂ monitoring
The tanker loading system consists of a loading spout, slide gate valve and piping.
Features
- Nitrogen purge; loading starts only when O₂ is below the set point
- Real-time O₂ monitoring for explosion-protected areas
- Automatic docking and automatic stop
- Simple structure, easy to operate
Applications
- Loading bulk road tankers
- Explosion-protected areas
Related products

Tanker Truck Unloading System
Intelligent air control, up to 40 t/h.
CLU CS01Container Loading Unit
Dense phase loading unit – low velocity, low air volume.
CLU CS02Container Loading Unit
Low installation height, easy retrofit, continuous variable-speed loading.
CLU CS03Container Loading Unit
Side-to-side swing for even filling, height-adjustable for different trucks.
Planning a new line or an upgrade?
Tell us your material, capacity and distance – our engineers will reply with a conveying concept and quotation.