BEST M+E project case: aluminium silos for Phase 1 of a POE project, major chemical company

BEST M+E was responsible for project management, design, supply, construction, installation and commissioning of the aluminium silos for Phase 1 of a POE project of a major chemical company. The project comprises 28 silos – degassing, off-spec, packing and inspection silos – with 180–500 m³ per silo, in SB209 A95454-O. The project was delivered on schedule and has passed acceptance.

Silo typeVolume per siloQuantity
Degassing silo500 m³18
Off-spec silo500 m³2
Packing silo180 m³4
Inspection silo182 m³4
Total180–500 m³28

Material: SB209 A95454-O aluminium alloy. Scope: project management, design, supply, construction, installation and commissioning.

Project references

  1. 01PP pneumatic conveying with 200 m³ storage silos and bulk container unloading
  2. 02PA6 nitrogen closed-loop conveying with 120 m³ storage silo and 80 m³ blending silo
  3. 03BPA tanker truck loading
  4. 04ABS bulk container loading
  5. 05PVC tanker truck unloading

On site

Planning a new line or an upgrade?

Tell us your material, capacity and distance – our engineers will reply with a conveying concept and quotation.

Chat on WhatsApp