BEST M+E project case: aluminium silos for Phase 1 of a POE project, major chemical company
BEST M+E was responsible for project management, design, supply, construction, installation and commissioning of the aluminium silos for Phase 1 of a POE project of a major chemical company. The project comprises 28 silos – degassing, off-spec, packing and inspection silos – with 180–500 m³ per silo, in SB209 A95454-O. The project was delivered on schedule and has passed acceptance.
| Silo type | Volume per silo | Quantity |
|---|---|---|
| Degassing silo | 500 m³ | 18 |
| Off-spec silo | 500 m³ | 2 |
| Packing silo | 180 m³ | 4 |
| Inspection silo | 182 m³ | 4 |
| Total | 180–500 m³ | 28 |
Material: SB209 A95454-O aluminium alloy. Scope: project management, design, supply, construction, installation and commissioning.
Project references
- 01PP pneumatic conveying with 200 m³ storage silos and bulk container unloading
- 02PA6 nitrogen closed-loop conveying with 120 m³ storage silo and 80 m³ blending silo
- 03BPA tanker truck loading
- 04ABS bulk container loading
- 05PVC tanker truck unloading
On site
Planning a new line or an upgrade?
Tell us your material, capacity and distance – our engineers will reply with a conveying concept and quotation.